
Infrastructure Project Management
Project management (conceptual to occupancy phase). Conceptual development of new, expansion, replacement of central energy systems. Master planning and cost modeling. construction administration. Authority Having Jurisdiction interface, Project Engineering
Related Projects

K-12
Columbia UniversityBoiler Plant Polisher & Softener Replacement
Columbia University enlisted the services of DM Engineers as an owner's project engineer to oversee a critical infrastructure project. This project involved the replacement of the condensate polisher and softener for the high-pressure boiler plant while ensuring the continuous operation of a sprawling 32-acre academic campus throughout the construction process.

Corporate
410 Park Avenue
Corporate
410 Park Avenue
The previous chiller plant for the 236,665 square foot (SF) commercial property was equipped with a 750-ton Trane absorption chiller. However, due to the absence of redundancy in the system and its limited capability to operate efficiently at low loads, the property owner decided to seek a more adaptable, reliable, and energy-efficient solution.