NYC SCA Science Lab Renovation
NYC School Construction Authority
Project description
The New York City School Construction Authority completed a full renovation of a science lab. DM Engineers, in collaboration with DMR Architects, developed a complete MEP design for the renovation project.
The MEP design by our team consisted of upgrading the electrical systems, including electric panels, power distribution, lighting, low voltage, and data wiring. Upgrades to the plumbing systems included providing sanitary and water supply connections to the new plumbing fixtures and the complete removal of gas piping related to the science lab. The HVAC system upgrade provided an adequate and efficient exhaust system.
DM Engineers performed a comprehensive study of the existing conditions and developed a feasibility report for the project. The design package was completed in May 2022.
-
COMPLETION DATE
June 2023
-
CLIENT/COMPANY NAME
NYC School Construction Authority
-
PROJECT SIZE
263,000 SQ FT
-
PROJECT COST
Undisclosed
-
FIRM ROLE
MEP Design