SUNY Downstate Medical Center
HVAC Upgrades
Performed required mechanical code inspections for the DLAR , SBS and IAVI HVAC Upgrades. Systems inspected included a 600-ton Central Chiller Plant addition of water cooled electric centrifugal chiller, pumps, valves, etc. in the existing chiller plant, the replacement of the existing fuel oil transfer pump set and associated controls with new fuel oil transfer system, modification to the existing main air handling units with over 40,000 CFM each, air handling unit upgrade for AHUs 1-4 which included replacement of large vane axial fan with fan array, replacement of air to air heat exchanger with glycol runaround coil heat exchanger, cooling coil, the installation of a new 1000KW/1250KVA diesel engine generator with automatic tranfer switches and performing a building management system conversion from pneumatic to direct digital controls.