Interfaith Medical Center

Medical Surge Floor Renovations

Interfaith Medical Center intends to renovate the 2nd floor, 3rd floor, and 4th floor in the Main Building as part of the overall transformation effort of One Brooklyn Health System. The plan is to gut renovate the second floor and refurbish the other floors to upgrade the M/S patient bed units (approximately 81).

In addition to create a renewed in-patient unit, the goal is to increase intensive care unit (ICU) bed count, allow for ICU overflow in the event of surge needs, and incorporate single beds into the bed count. One key objective is to upgrade all mechanical, electrical, plumbing, fire protection, IT, and security infrastructure to meet current building codes. The construction of the project will be phased in such a way that the M/S unit can remain operational for the duration of the buildout.

DM Engineers in partnership with Cosentini Engineers developed the design for the MEP displines for this project. Specifically DM performed the electrical, fire alarm and IT design from schematic thru construction documents.

Project Details

COMPLETION DATE
February 2023 (Projected)
FIRM ROLE
MEP Design
CLIENT/ COMPANY NAME
Cosentini Consulting Engineers
PROJECT SIZE
22,646 SF
PROGRAM
Healthcare

Related Projects

Columbia University

Columbia University engaged DM Engineers as a project engineer to manage the replacement of the...

Brookdale Hospital Medical Center

One Brooklyn Health System (OBHS) renovated the Intensive Care Unit located on the fifth floor...

Bodegón de la Candelaria

This is the first project looking for green sustainability within the colonial town of Cartagena de Indias. This complex...
See more