Interfaith Medical Center
Medical Surge Floor Renovations
Interfaith Medical Center intends to renovate the 2nd floor, 3rd floor, and 4th floor in the Main Building as part of the overall transformation effort of One Brooklyn Health System. The plan is to gut renovate the second floor and refurbish the other floors to upgrade the M/S patient bed units (approximately 81).
In addition to create a renewed in-patient unit, the goal is to increase intensive care unit (ICU) bed count, allow for ICU overflow in the event of surge needs, and incorporate single beds into the bed count. One key objective is to upgrade all mechanical, electrical, plumbing, fire protection, IT, and security infrastructure to meet current building codes. The construction of the project will be phased in such a way that the M/S unit can remain operational for the duration of the buildout.
DM Engineers in partnership with Cosentini Engineers developed the design for the MEP displines for this project. Specifically DM performed the electrical, fire alarm and IT design from schematic thru construction documents.



Project Details

COMPLETION DATE

FIRM ROLE


CLIENT/ COMPANY NAME


PROJECT SIZE