Jamaica Hospital Medical Center sought to significantly enhance the HVAC equipment in the A/B building data center and the uninterruptible power supply (UPS) room to ensure optimal performance and reliability. The existing system in the data center provides a robust total cooling capacity, while the UPS room by supplemental units. DM Engineers was entrusted with the comprehensive mechanical, electrical, and fire alarm design for this critical upgrade. Our design included provisions for additional redundancy capacity to future-proof the facility against potential failures.

 

The project was meticulously planned in a phased manner to ensure seamless, uninterrupted operation of both the data center and the UPS room. This approach involved the strategic implementation of backup systems to maintain critical operations during HVAC interruptions. By prioritizing reliability and minimizing downtime, DM Engineers ensured that the upgraded HVAC systems would support the hospital’s mission-critical activities effectively and efficiently.

  • Icon 1

    CLIENT/COMPANY NAME

    Jamaica Hospital Medical Center

  • Icon 2

    COMPLETION DATE

    December 2024

  • Icon 3

    PROJECT COST

    Undisclosed

  • Icon 4

    PROJECT SIZE

    70 Clg Ton

  • Icon 5

    FIRM ROLE

    MEP Design