The previous chiller plant for the 236,665 square foot (SF) commercial property was equipped with a 750-ton Trane absorption chiller. However, due to the absence of redundancy in the system and its limited capability to operate efficiently at low loads, the property owner decided to seek a more adaptable, reliable, and energy-efficient solution.

15 enero, 2025
DM Engineers was engaged to by New York Installers Inc to provide MEP design-build for the replacement of the entire heating and domestic hot water systems at the facility, involving the installation of four high-efficiency Lochinvar combination boilers. Each of these boilers, with an output capacity of 999 MBH